More space, without moving.

Bump-outs, first-floor additions and full second storeys — designed, permitted and built by the same team, with your roof open for as little time as possible.

NJ-based · Old BridgeLicensed & InsuredFree on-site quoteOwner-led — you work with Adam
What we build

Out, or up.

Most additions start with the same question: is there room on the lot to go out, or does the space have to come from a second storey? Setbacks, coverage limits and your existing foundation usually answer it for you.

Going out is generally simpler and keeps your roof intact. Going up avoids losing garden and often suits older properties on tighter lots — but it is the bigger undertaking, and the one where sequencing matters most.

  • Bump-outs and single-room extensions
  • Full first-floor additions
  • Second-storey additions
  • Primary suites and in-law suites
  • Kitchen and living space extensions
  • Garage conversions and additions over garages
second story addition in middlesex county in progress
Why Legion Build

The biggest job we do, run by the person who quoted it.

01

Structural work done properly

An addition ties into your existing foundation, framing and roof. Those connections are engineered and inspected, not improvised on site.

02

Your house stays weather-tight

On a second storey the roof comes off. Sequencing and weather protection are planned before demolition, because that is the part homeowners rightly worry about.

03

One point of contact

Architect, engineer, township, trades — all coordinated by Adam. You are not the one chasing a structural letter or an inspector.

What it costs

Roughly $250 to $450+ per square foot.

That is the range we work from for additions in New Jersey, and it is wide for good reason — an addition is a foundation, a frame, a roof, a full mechanical fit-out and a finished interior, all tied into a house that already exists. Four things decide where in the range you land.

01

Out or up

A first-floor addition needs new foundation and roof but leaves your existing roof alone. A second storey needs no new foundation footprint but does mean taking the roof off and reinforcing what is underneath.

02

What the existing house can carry

Older foundations and undersized framing sometimes need reinforcing before they can take another floor. It is structural work with no visible result, and it is the most common budget surprise.

03

Mechanicals

New square footage needs heating, cooling, electrical and often plumbing. Whether your existing systems have the capacity to extend, or need replacing, is a significant line either way.

04

What goes in it

A bedroom and a bathroom is a different fit-out from a primary suite with a walk-in and a wet room, or an in-law suite with its own kitchen.

Weighing it against finishing the basement instead? We compare the two directly in basement vs home addition cost in NJ, and against converting the garage in garage conversion vs home addition.

Recent work

A few additions we’ve built.

How it works

The longest lead time is the paperwork, not the build.

An addition needs architectural drawings, structural engineering and zoning review before anyone breaks ground. We tell you that up front so the early quiet weeks do not feel like nothing is happening.

STAGE 01

Feasibility & design

Setbacks, lot coverage and what your existing structure can carry. Adam works out whether you are going out or up, then drawings are produced.

STAGE 02

Engineering & permits

Structural engineering, then submission to the township. Zoning review can add time on top of building review. This is the least predictable stage.

STAGE 03

Foundation & shell

Footings and foundation, framing, roof and weather-tight envelope. On a second storey this stage is sequenced tightly around the forecast.

STAGE 04

Fit-out & inspection

Mechanicals, insulation, drywall, then flooring and finishes. Inspections throughout, and a walkthrough with you before the job closes.

You stay in your house for most additions. Where that is not practical — usually part of a second-storey build — we tell you before you sign, not halfway through.

Before you commit

Is an addition actually the right answer?

Sometimes it is not, and we would rather say so early. Three cheaper routes solve the same problem for some households.

01

Finish the basement instead

Often 40–60% less per square foot, because the structure already exists. The trade-off is daylight — a basement will never be a bright room.

02

Convert the garage

Walls, roof and slab are already there. It is the cheapest way to add a room, provided you can live without the garage and the town permits the change of use.

03

Add a sunroom

If what you want is light and somewhere to sit, a four-season sunroom gets you there for considerably less than a full addition.

04

Or build the addition

When you need bedrooms, a primary suite or genuine separate living space, nothing else substitutes. That is when an addition earns its cost.

Compare the options: basement finishing, garage conversion costs, or custom sunrooms.

Service area

Serving Central New Jersey and the Shore.

Based in Old Bridge, we build additions across five counties.

MonmouthOceanMiddlesexSomersetUnion
Common questions

Addition questions we get asked.

How much does a home addition cost in New Jersey?

As a planning figure, roughly $250 to $450+ per square foot. The range is wide because an addition is a foundation, a frame, a roof, full mechanicals and a finished interior all tied into an existing house. Whether you go out or up, and what your existing structure can carry, decide where you land.

Is it cheaper to build out or up?

Neither is reliably cheaper. Building out needs new foundation and roof but leaves your existing roof untouched. Building up needs no new foundation footprint but means removing the roof and often reinforcing the framing and foundation below. Setbacks and lot coverage usually make the decision before cost does.

Do I need to move out during the build?

For most additions, no — you stay in the house. The exception is part of a second-storey build, where the roof is off. If that applies to your project we tell you before you sign rather than halfway through.

How long does a home addition take?

Longer than people expect, and most of the extra is paperwork. Architectural drawings, structural engineering and township review all come before ground is broken, and zoning review can add time on top of building review. The construction itself is the more predictable half.

Will my foundation support a second storey?

Sometimes yes, sometimes it needs reinforcing. Older foundations and undersized framing are common in the housing stock here. A structural engineer assesses it as part of the design stage, so it is priced in rather than discovered once the roof is off.

Do I need architectural drawings and an engineer?

Yes, for anything beyond a small bump-out. We coordinate both, along with the township submission, so you are not managing separate professionals or chasing a structural letter yourself.

Would finishing the basement be a cheaper way to get the space?

Often substantially — frequently 40–60% less per square foot, since the foundation, walls and roof already exist. The trade-off is daylight. If you need bedrooms or genuine separate living space, an addition is usually still the right answer.

Can you build an addition over the garage?

Yes, and it is a common way to add a primary suite without losing garden. What has to be checked first is whether the garage foundation and framing were built to carry a floor above, which frequently means reinforcing them.

Free on-site quote

Get a straight number for your addition.

You work directly with Adam, the owner — no call centres, no franchise reps. He’ll walk the property, talk through what is feasible, and give you an honest quote in writing.

Request a Free Quote
Call Us Today (732) 674-3454